Phone: 01582 667000  |  Email: info@active-groupuk.com

SCOPE OF WORKS

  • Asbestos and lead paint survey
  • Soft strip the entire site
  • Installation of temporary propping to crane base and top floor retained walls
  • Removal of all windows
  • Breaking out drainage routes within basement slab
  • Cut and break out riser and staircase openings
  • Removal of original concrete staircase
  • Demolition of external boundary wall 
  • Removal of roof parapet wall
  • Removal of timber and bitumen roof
  • Cut and remove top floor structural steels and columns

CLIENT

Client: Developer
Project Value: £95,000
Location: Bromley-By-Bow - London

    PROJECT SUMMARY

    The project consisted of a structural cut and carve office refurbishment in Central London with demolition elements involving Soft Strip, removal of existing roof and structure to allow additional storey of construction and removal of existing stair core to create new office space.

    Midlands Head Office
    Phone: 01582 667000
    Email: info@active-groupuk.com

    South East Office
    Phone: 01959 569946
    Email: info@active-groupuk.com

    South West Office
    Phone: 0123 763 3053
    Email: info@active-groupuk.com

    Greater London Office
    Phone: 01582 667000
    Email: info@active-groupuk.com

    © 2020 Active Enviro All Rights Reserved